Delivery and installation of wind turbines for the project “Construction of the Postolin wind farm”

Eolica Postolin spółka z ograniczoną odpowiedzialnością

The subject of the order is the delivery, supply and launching of seventeen wind turbines for wind power plants built under the project “Construction of the Postolin wind farm”.

Termin

Termin składania ofert wynosił 2013-09-16. Zamówienie zostało opublikowane na stronie 2013-08-01.

Kto? Co? Gdzie?
Historia zamówień
Data Dokument
2013-08-01 Ogłoszenie o zamówieniu
2013-10-10 Dodatkowe informacje
2013-10-10 Dodatkowe informacje
Ogłoszenie o zamówieniu (2013-08-01)
Obiekt
Zakres zamówienia
Tytuł: Elektrownie wiatrowe
Wielkość lub zakres:
The subject of the order is the delivery, supply and launching of seventeen wind turbines for wind power plants built under the project “Construction of the Postolin wind farm” with the following parameters:a) Wind turbine: min. 1.5 MW, max. 2.0 MW each turbine;b) Maximum hub height: 100 m;c) Maximum height, defined as hub height plus the blade: 145 m;d) Noise level generated by the wind plant: not higher than 106.4 dB (A) (assuming 95% the nominal power or the 8 m/s wind speed).1.1 The subject of the order:a) Transport, delivery and installation of wind turbines described in the Term of Reference and in the Technical Documentation.b) Delivering the components anchoring the wind turbines in the foundation.c) Launching and conducting start-up tests of wind plants.d) Connecting internal lightning protection installation within the tower.e) Delivery and connection of the monitoring system for the wind plants.f) Delivery and connection of switchgears and electrical transformer.g) Delivery and installation of the internal transportation elevator.h) Day and night warning markings pursuant to Polish standards.i) Providing the Principal with a complete set of attestations and certificates.1.2 Other obligations and actions of the Contractor under this order, in particular:a) performing the subject of the Agreement pursuant to the permits obtained by the Principal,b) management, securing and marking of the construction site – according to the binding provisions of law,c) ensuring security for the property within the construction site and the fire protection,d) taking out the disassembled elements that cannot be used on the construction site to perform the subject of the Agreement as well as to take out all and any waste connected with the Agreement's performance from the construction site and to dispose of them pursuant to the provisions of law,e) the subject of the Agreement performed must be consistent with the binding provisions of law and the quality standards that are required for the installation of the devices within the territory of Poland; they also must have all the certificates required by the law,f) accepting the wind resource records of the site and certifing that the wind turbines are appropriate for the site's wind resource records.g) making a statement on meeting and accepting the conditions stipulated in the Technical Documentation.h) performance of the subject of the Agreement pursuant to the requirements of law, binding standards, requirements of the environment protection and while maintaining the principles of work and safety,i) covering the costs connected with transporting the turbines, potential external roads modification and permitting, other transportation costs as well as the costs of all the works and services performed outside the Wind Farm.1.3 Conditions for performing the works:a) the Contractor will ensure the accessibility of all the roads leading to the construction site and will obtain the required approvals of the proper external road administrators and will bear all the costs connected with the above,b) before commencing the works the Contractor should inform the Principal about the planned date of commencing works,c) the Contractor is obligated to provide the Principal with documents concerning the method of waste management, after the subject of the Agreement is completed, the Contractor is obliged to tidy the construction site.1.4 In the case that, due to chosen turbines characteristics, additional civil works not provided for in the Technical Documentation have to be conducted, costs of these works and permitting connected with these works will be incurred by the Contractor, whose offer was selected. The Contractor shall not be entitled to any additional remuneration connected with the aforementioned works. The Contractor will choose a professional entity to perform these works, with the reservation that the offer to perform these works will be addressed also to the Principal's contractor of the construction and electrical works chosen in the tender procedure of „Construction and electrical works related to the construction of the Postolin wind farm”.
Pokaż więcej
Metadane ogłoszenia
Język oryginału: angielski 🗣️
polski 🗣️
Typ dokumentu: Ogłoszenie o zamówieniu
Rodzaj zamówienia: Dostawy
Regulacja: Unia Europejska
Wspólny słownik zamówień (CPV)
Kod: Elektrownie wiatrowe 📦

Procedura
Typ procedury: Procedura otwarta
Typ oferty: Wniosek dotyczący wszystkich partii
Kryteria przyznawania nagród
Oferta najbardziej korzystna ekonomicznie

Instytucja zamawiająca
Tożsamość
Kraj: Polska 🇵🇱
Typ instytucji zamawiającej: Inne
Nazwa instytucji zamawiającej: Eolica Postolin spółka z ograniczoną odpowiedzialnością
Adres pocztowy: ul. Krasińskiego 19
Kod pocztowy: 85-008
Miasto pocztowe: Bydgoszcz
Kontakt
Adres internetowy: http://www.eolicapostolin.pl 🌏
E-mail: info@eolicapostolin.pl 📧
Telefon: +48 503195494 📞

Odniesienie
Daty
Data wysłania: 2013-08-01 📅
Termin składania ofert: 2013-09-16 📅
Data publikacji: 2013-08-06 📅
Identyfikatory
Numer ogłoszenia: 2013/S 151-262568
Numer Dz.U.-S: 151
Informacje dodatkowe
1. The Principal reserves the right to cancel the procedure for awarding the order at any of its stages, without any reason and without incurring any penalty. 2. The Principal will provide the technical documentation in electronic form. The technical documentation will be provided by the Principal after submitting by the Contractor the signed agreement on protection of confidential information.
Pokaż więcej

Obiekt
Zakres zamówienia
Krótki opis:
The subject of the order is the delivery, supply and launching of seventeen wind turbines for wind power plants built under the project “Construction of the Postolin wind farm”.
Wielkość lub zakres:
The subject of the order is the delivery, supply and launching of seventeen wind turbines for wind power plants built under the project “Construction of the Postolin wind farm” with the following parameters:
a) Wind turbine: min. 1.5 MW, max. 2.0 MW each turbine;
b) Maximum hub height: 100 m;
c) Maximum height, defined as hub height plus the blade: 145 m;
d) Noise level generated by the wind plant: not higher than 106.4 dB (A) (assuming 95% the nominal power or the 8 m/s wind speed).
1.1 The subject of the order:
a) Transport, delivery and installation of wind turbines described in the Term of Reference and in the Technical Documentation.
b) Delivering the components anchoring the wind turbines in the foundation.
c) Launching and conducting start-up tests of wind plants.
d) Connecting internal lightning protection installation within the tower.
e) Delivery and connection of the monitoring system for the wind plants.
f) Delivery and connection of switchgears and electrical transformer.
g) Delivery and installation of the internal transportation elevator.
h) Day and night warning markings pursuant to Polish standards.
i) Providing the Principal with a complete set of attestations and certificates.
1.2 Other obligations and actions of the Contractor under this order, in particular:
a) performing the subject of the Agreement pursuant to the permits obtained by the Principal,
b) management, securing and marking of the construction site – according to the binding provisions of law,
c) ensuring security for the property within the construction site and the fire protection,
d) taking out the disassembled elements that cannot be used on the construction site to perform the subject of the Agreement as well as to take out all and any waste connected with the Agreement's performance from the construction site and to dispose of them pursuant to the provisions of law,
Pokaż więcej
e) the subject of the Agreement performed must be consistent with the binding provisions of law and the quality standards that are required for the installation of the devices within the territory of Poland; they also must have all the certificates required by the law,
Pokaż więcej
f) accepting the wind resource records of the site and certifing that the wind turbines are appropriate for the site's wind resource records.
g) making a statement on meeting and accepting the conditions stipulated in the Technical Documentation.
h) performance of the subject of the Agreement pursuant to the requirements of law, binding standards, requirements of the environment protection and while maintaining the principles of work and safety,
i) covering the costs connected with transporting the turbines, potential external roads modification and permitting, other transportation costs as well as the costs of all the works and services performed outside the Wind Farm.
1.3 Conditions for performing the works:
a) the Contractor will ensure the accessibility of all the roads leading to the construction site and will obtain the required approvals of the proper external road administrators and will bear all the costs connected with the above,
b) before commencing the works the Contractor should inform the Principal about the planned date of commencing works,
c) the Contractor is obligated to provide the Principal with documents concerning the method of waste management, after the subject of the Agreement is completed, the Contractor is obliged to tidy the construction site.
1.4 In the case that, due to chosen turbines characteristics, additional civil works not provided for in the Technical Documentation have to be conducted, costs of these works and permitting connected with these works will be incurred by the Contractor, whose offer was selected. The Contractor shall not be entitled to any additional remuneration connected with the aforementioned works. The Contractor will choose a professional entity to perform these works, with the reservation that the offer to perform these works will be addressed also to the Principal's contractor of the construction and electrical works chosen in the tender procedure of „Construction and electrical works related to the construction of the Postolin wind farm”.
Pokaż więcej
Nazwa projektu lub programu finansowanego przez UE:
The investment project which is the subject matter of the order benefits from European Union financial aid under measure 9.4. “Generating power from renewable sources” of priority IX, “Environment-friendly energy infrastructure and energy efficiency” of the Operational Program Infrastructure and Environment 2007-2013.
Pokaż więcej
Miejsce wykonania
Główne miejsce lub miejsce wykonywania działalności: Pomeranian Voivodeship, Sztum commune and Ryjewo commune, town of Postolin.

Informacje prawne, ekonomiczne, finansowe i techniczne
Warunki uczestnictwa
Zdolność do prowadzenia działalności zawodowej:
1. Transcript from the relevant register or certificate of an entry into the register of economic activity should be enclosed with the tender.
2. All documents, statements, certificates and powers of attorney required by the Principal should be submitted along with the tender, if granted, in particular:
a) document certifying that the Contractor is having financial means or credit capacity for at least 80% of the estimated value, e.g. a bank account statement, credit promise,
b) copies of type certified IEC s 61400-22
c) power curve and Ct curve guarantee documents applicable to wind turbines offered by the Contractor,
d) noise emission guarantee document applicable to wind turbines offered by the Contractor.
3. To confirm that the Contractor is not subject to exclusion, the following should be submitted:
a) statement on no reasons to exclude from the order awarding procedure (Appendix No. 4 to ToR)
b) valid transcript from the relevant register (Register of Entrepreneurs of the National Court Register or other applicable register), provided that the separate provisions require an entry to the register to demonstrate no reasons to exclude and for natural persons - relevant statement).
Pokaż więcej
4. As regards the condition of the knowledge and experience, the list of works consisting of delivery, installation and launching of wind plants for wind farms located in European Union, for the total power of at least 1000 MW, with specification of works performed in Poland (Appendix No. 6 to ToR). For the purposes of verifying the list, the Contractor must enclose references issued by his partners, signed by the persons authorized to represent the partners. The references will confirm that the works consisting in the delivery, installation and launching of wind plants were or has been performed properly.
Pokaż więcej
5. List of persons participating in the delivery of the order, in particular responsible for providing the services, quality control or construction works managing, including information on their professional qualifications, experience and education necessary to deliver the order as well as scope of performed activities and information on the basis to dispose these persons (Appendix No. 5 to ToR). The selected Contractor, prior to the conclusion of the Agreement, will be obliged to provide the Principal with the current statement confirming that the construction manager belongs to a relevant Polish professional association. In the case of the construction managers that are not citizens of the Republic of Poland, the Principal will require provision of a decision of a relevant chamber of construction engineers on the recognition of the professional qualifications or a statement on temporary registration on the list of members of construction engineers, in the case of providing cross-border services.
Pokaż więcej
6. Statement that the persons participating in the order delivery hold the required certificates, provided that the legal acts impost such obligation (Appendix No. 7 to ToR).
Sytuacja gospodarcza i finansowa:
1. The Contractors who may bid for this order are those who meet the conditions of stable financial and economic condition.
2. The condition will be deemed fulfilled if the Contractor proves having financial means or credit capacity for at least 80 % of the estimated value.
3. Along with the tender the Contractor should deliver a document certifying that the Contractor is having financial means or credit capacity for at least 80% of the estimated value specified in point III.2, e.g. a bank account statement, credit promise.
Pokaż więcej
Zdolności techniczne i zawodowe:
1. The Contractors authorized to apply for Agreement awarding.
The Contractors who may bid for this order are those who:
a) are not subject to exclusion as defined in Article 24 of the Public procurement law,
b) meet the conditions of holding the certificate for specific type of activity or activities, provided that such obligation is imposed by legislation,
c) meet the condition of knowledge and experience,
d) meet the conditions of holding applicable technical capacity,
e) meet the conditions of the acceptance of the site and acceptance of the Technical Documentation.
2. The entitlements for specific type of activity or activities, provided that such obligation is imposed by legislation.
Compliance assessment for this condition
The condition shall be considered met, if the Contractor submits a relevant statement and information on professional qualifications, experience and education. Compliance assessment for this condition will be performed on compliant/non-compliant basis, based on the required documents and statements enclosed to the tender offer.
Pokaż więcej
3. Knowledge and experience
The condition shall be considered met, if the Contractor proves that over the five years preceding the lapse of the deadline for submitting tenders, and if the period of running business activity is shorter – over that period, performed similar works comprising in delivery, installation and launching of wind turbines for wind farms for the total power of at least 1000 MW in European Union.
Pokaż więcej
In order to prove the compliance with this condition, the Contractor should enclose a list of the works performed to the tender, including the indication of the place of installation, number of the plants installed, duration of the given task. Moreover, the Contractor should provide references in their original copies or copies confirmed for compliance with the original copy by the persons authorized to represent the entities, for the benefit of which the Contractor performed those works.
Pokaż więcej
Moreover, the Contractor must show that his employees meet the conditions of holding the certificate for specific type of activity or activities, provided that such obligation is imposed by legislation.
4. Technical capacity
The condition will be deemed fulfilled if the Contractor proves that the wind turbines offered by the Contractor have the type certificate IEC 61400-22.
5. Acceptance of the site and of the Technical Documentation
The condition will be deemed fulfilled if the Contractor:
a) has visited the site and accepted it,
b) has accepted the Technical Documentation.
The aforementioned shall be confirmed by providing the Principal with the Contractor's statement.
6. Operation and Maintenance
The condition will be deemed fulfilled if the Contractor oblige itself that the Contractor shall provide the Operation and Maintenance services according the following scope:
a) The Operation and Maintenance of the wind turbines during the first 10 (ten) years after the Final Acceptance takes place (full service contract) including:
— All services required for scheduled and unscheduled maintenance. The Contractor shall correct any fault, defects or security risk identified during the routine operational or maintenance activities without any delay after they have been identified in order to fulfill the required guaranties.
Pokaż więcej
— Everyday presence of Contractor's personnel (at least two skilled technicians) on site during working time (8:00 a.m. till 17:00 p.m.).
— Continuous operation and 24 hours a day, 7 days a week monitoring of the wind farm through SCADA system. The Contractor shall completely operate and re-start the turbines.
— The provision of all required components, spare parts, consumables, labour and travel.
— Maintaining a minimum stock of spare parts on site.
— Supply and transport of main components.
— Crane hired, if required.
— Wind turbine switchgears operation.
— The Contractor shall provide real time operational data of the Wind Farm's SCADA to the Principal and shall maintain the SCADA system (24 hours a day, 7 days a week) in order to facilitate the Wind Farm Operation and Maintenance supervision and shall make available the data onward transmission to the Principal.
Pokaż więcej
— Communications through a satellite network 24 hours a day, 7 days a week.
— Detailed and personalized monthly technical reports.
— Providing training course of at least 40 hours for 4 people.
— Attendance of the Contractor's representatives during any audits/visits conducted by local / national authorities or inspectors.
b) The offered by the Contractor annual remuneration for the full Operation and Maintenance services as described above shall not exceed 38 PLN/MWh (net) with a minimum of 160.740 PLN/wind turbine generator/year (net). MWh reflects the total net energy produced by the Wind Farm every year. The annual remuneration shall be adjusted according to the rate of inflation of Harmonised Index of Consumer Prices HICP (Percentage change m/m-12) for all the EU Member States(data published on Eurostat's website epp.eurostat.ec.europa.eu).
Pokaż więcej
c) The payment of the remuneration shall be made within 60 days from the invoicing date. The invoice will be issued every three months according to the net energy produced by the Wind Farm during those three months.
Realizacja zamówienia
Wymagane depozyty i gwarancje:
Good agreement performance guarantee:
In order to secure the proper performance of the Agreement, the Principal requires a good Agreement performance guarantee lodged according to conditions specified in ToR.
Guarantees:
The Contractor will provide the Principal with the following guarantees for the wind plants:
a) product guarantee,
b) Energy-Based Availability, at least 97 %
c) power curve guarantee, at least 97 %
d) noise emission guarantee.
Główne warunki finansowania i ustalenia dotyczące płatności i/lub odniesienie do odpowiednich przepisów regulujących je:
1. The payment shall be made in the form of partial payments based on the invoices issued by the Contractor.
2. The invoices shall be paid by the Principal within 60 days from the day the Principal receives a correctly issued invoice.
3. The payment schedule is specified in ToR.

Procedura
Okres ważności oferty: 60 dni
Data otwarcia ofert: 2013-09-16 📅
Miejsce otwarcia: Bydgoszcz.
Miejsce: Bydgoszcz.
Informacje o osobach upoważnionych i procedurze otwarcia:
Opening of the tender offers shall be of open nature and take place directly upon the expiry of their submission date, provided that the day of expiry of submission date is the day of tender offer opening.
Języki
Język: angielski 🗣️
polski 🗣️

Instytucja zamawiająca
Tożsamość
Inny rodzaj instytucji zamawiającej: Other
Kontakt
Punkt kontaktowy: Eolica Postolin spółka z ograniczoną odpowiedzialnością
Karol Wypijewski

Odniesienie
Informacje dodatkowe
1. The Principal reserves the right to cancel the procedure for awarding the order at any of its stages, without any reason and without incurring any penalty.
2. The Principal will provide the technical documentation in electronic form. The technical documentation will be provided by the Principal after submitting by the Contractor the signed agreement on protection of confidential information.
Źródło: OJS 2013/S 151-262568 (2013-08-01)
Dodatkowe informacje (2013-10-10)
Obiekt
Metadane ogłoszenia
Typ dokumentu: Dodatkowe informacje

Odniesienie
Daty
Data wysłania: 2013-10-10 📅
Data publikacji: 2013-10-12 📅
Identyfikatory
Numer ogłoszenia: 2013/S 199-343469
Odnosi się do ogłoszenia: 2013/S 151-262568
Numer Dz.U.-S: 199
Źródło: OJS 2013/S 199-343469 (2013-10-10)
Dodatkowe informacje (2013-10-10)
Odniesienie
Identyfikatory
Numer ogłoszenia: 2013/S 199-343475
Źródło: OJS 2013/S 199-343475 (2013-10-10)