Supply, installation and start-up of oil and/or gas fired, double flame tube water boilers with total thermal capacity of approximately 340 MWt plus approximately 330 MWt as options and one optional single flame tube steam boiler all for EDF production sites in Poland
For all boilers the scope of works covers:
— delivery of oil and/or gas fired, double flame tube water boilers of thermal capacity between approximately 28 MWt and approximately 38 MWt
— rection
— construction supervision of all connections in all branches
— staff training
— boilers start-up
Total thermal capacity for each location:
— up to 280 MWt for CHP in Krakow / EDF Polska S.A. Oddział nr 1 w Krakowie, ul. Ciepłownicza 1; 31-587 Kraków
— approximately 60 MWt for CHP in Gdynia / EDF Wybrzeże S.A. - Elektrociepłownia Gdyńska; ul. Pucka 118, 81-154 Gdynia
Options:
— approximately 330 MWt for other production sites of EDF in Poland
— approximately 9MWt in form of steam for one of the production sites of EDF in Poland
Termin
Termin składania ofert wynosił 2013-10-10.
Zamówienie zostało opublikowane na stronie 2013-09-19.
Kto?
Co?
Historia zamówień
Data |
Dokument |
2013-09-19
|
Ogłoszenie o zamówieniu
|
2013-09-24
|
Dodatkowe informacje
|
2013-10-11
|
Dodatkowe informacje
|
2013-10-29
|
Dodatkowe informacje
|