Supply of two gas-turbines for EDF Toruń S.A. and an option for two additional gas-turbines to CHPs belonging to EDF Polska Group
Design, manufacture, supply, transportation, installation, commissioning, start-up and test of two gas turbine generator packages each having jet derivative gas turbine with an ISO power in the order of approximately 50 MW at an ISO gross efficiency of not less than 41% complete with the driven electrical generator and ancillary systems along with one LTSC for one site. Two additional gas turbine generator packages of the same type shall be provided as a first option for contracting within one year.
Furthermore, one additional LTSC option shall be provided (for the other site) for contracting within two years.
Termin
Termin składania ofert wynosił 2013-08-12.
Zamówienie zostało opublikowane na stronie 2013-07-22.
Dostawcy
Następujący dostawcy są wymienieni w decyzjach o przyznaniu zamówienia lub innych dokumentach dotyczących zamówień:
Kto?
Co?
Gdzie?
Historia zamówień
Data |
Dokument |
2013-07-22
|
Ogłoszenie o zamówieniu
|
2013-07-29
|
Dodatkowe informacje
|
2014-09-24
|
Dodatkowe informacje
|
2015-01-26
|
Ogłoszenie o udzieleniu zamówienia
|
2015-01-30
|
Ogłoszenie o udzieleniu zamówienia
|