Development of Feasibility Study of E40 Dnieper-Vistula Waterway Restoration
The overall objective of the project of which this contract will be a part is to contribute to greater economic attractiveness and transport accessibility of the Polish, Belarusian and Ukrainian regions through successful implementation of Phase 1 “Analysis and preparation” and laying a foundation for implementation of Phase 2 “Planning” and Phase 3 “Construction” of the big-scale infrastructure project on restoration of an important international arterial waterway E40 on the section Dnieper – Prypiać – Dnerpo-Bug waterway – Muchaviec – Zaсhodni Buh – Vistula. The expected result of the Phase 1 “Analysis and preparation” is a comprehensive Feasibility Study of E40 restoration.
The main result to be achieved by the Contractor is the comprehensive Feasibility Study, consisting of following parts:
- Transport Economic and Market Analysis Report;
- Environmental and Socio-Economic Impact Assessment Report;
- Navigability Report and Technical Specifications of the Е40 Waterway;
- Financing and legal/institutional arrangements Report.
Termin
Termin składania ofert wynosił 2014-06-27.
Zamówienie zostało opublikowane na stronie 2014-06-06.
Kto?
Co?
Historia zamówień
Data |
Dokument |
2014-06-06
|
Ogłoszenie o zamówieniu
|
2014-06-12
|
Dodatkowe informacje
|