Development of feasibility study of E40 Dnieper – Vistula Waterway Restoration
The overall objective of the project of which this contract will be a part is to contribute to greater economic attractiveness and transport accessibility of the Polish, Belarusian and Ukrainian regions through successful implementation of Phase 1 ‘Analysis and preparation’ and laying a foundation for implementation of Phase 2 ‘Planning’ and Phase 3 ‘Construction’ of the big-scale infrastructure project on restoration of an important international arterial waterway E40 on the section Dnieper – Prypiać – Dnerpo-Bug waterway – Muchaviec – Zaсhodni Buh – Vistula. The expected result of the Phase 1 ‘Analysis and preparation’ is a comprehensive feasibility study of E40 restoration.
The main result to be achieved by the Contractor is the comprehensive feasibility study, consisting of following parts:
— transport economic and market analysis report;
— environmental and socio-economic impact assessment report;
— navigability report and technical specifications of the Е40 waterway;
— financing and legal/institutional arrangements report.
Termin
Termin składania ofert wynosił 2014-08-29.
Zamówienie zostało opublikowane na stronie 2014-07-18.
Dostawcy
Następujący dostawcy są wymienieni w decyzjach o przyznaniu zamówienia lub innych dokumentach dotyczących zamówień:
Kto?
Co?
Historia zamówień
Data |
Dokument |
2014-07-18
|
Ogłoszenie o zamówieniu
|
2014-12-02
|
Ogłoszenie o udzieleniu zamówienia
|