Execution of the Building Permit Design together with obtaining Construction Permit for the Baltica-2 and Baltica-3 offshore windfarm projects - Lot 1 and Lot 2
The subject of the Order includes amongst others preparation of the Building Permit Designs in accordance with Construction Law, consisting out of: Land Development Plan, Architectural Construction Design, Technical Design, all required opinions, agreements, expertises, permits (except for the ones which will be prepared and provided by the Employer, information will be provided in the Scope of Work) for the following BAL02 and BAL03 offshore windfarm (excluding transmissions system) project packages:
• OSS: all offshore substations including topside, MSF and substructure as well as all other remaining components;
• WTG & FOU: WTGs including tower, substructure, foundation, secondary steel, other components and auxiliary equipment;
• IAC: inter-array cables network
In case of significant changes in the design, contractor will submit the so-called‚ replacement designs’ including all the incorporated amendments (OPTION)
Termin
Termin składania ofert wynosił 2022-01-31.
Zamówienie zostało opublikowane na stronie 2021-12-22.
Dostawcy
Następujący dostawcy są wymienieni w decyzjach o przyznaniu zamówienia lub innych dokumentach dotyczących zamówień:
Ogłoszenie o zamówieniu (2021-12-22) Instytucja zamawiająca Nazwa i adresy
Nazwa: Elektrownia Wiatrowa Baltica 2 sp. z o.o.
Krajowy numer rejestracyjny: 0000393178
Adres pocztowy: ul. Mokotowska 49
Miasto pocztowe: Warsaw
Kod pocztowy: 00-542
Kraj: Polska 🇵🇱
Osoba kontaktowa: Piotr Gowik
E-mail: piotr_gowik@gkpge.pl📧
Region: Miasto Warszawa🏙️
URL: https://www.gkpge.pl/🌏
Adres profilu nabywcy: https://www.gkpge.pl/bip/Przetargi🌏
Instytucja zamawiająca (dodatkowa)
Nazwa: Elektrownia Wiatrowa Baltica 3 sp. z o.o.
Krajowy numer rejestracyjny: 0000393178
Adres pocztowy: ul. Mokotowska 49
Miasto pocztowe: Warsaw
Osoba kontaktowa: Piotr Gowik
Adres profilu nabywcy: https://www.gkpge.pl/bip/Przetargi🌏
Instytucja zamawiająca Informacja o wspólnych zamówieniach
Umowa obejmuje wspólne zamówienia
Komunikacja
Dokumenty URL: https://swpp2.gkpge.pl🌏
Adres URL uczestnictwa: https://swpp2.gkpge.pl🌏
Obiekt Zakres zamówienia
Tytuł:
“Execution of the Building Permit Design together with obtaining Construction Permit for the Baltica-2 and Baltica-3 offshore windfarm projects - Lot 1 and...”
Tytuł
Execution of the Building Permit Design together with obtaining Construction Permit for the Baltica-2 and Baltica-3 offshore windfarm projects - Lot 1 and Lot 2
POST/BAL/BAL/PROC/00013/2021
Pokaż więcej
Produkty/usługi: Usługi inżynieryjne w zakresie projektowania📦
Krótki opis:
“The subject of the Order includes amongst others preparation of the Building Permit Designs in accordance with Construction Law, consisting out of: Land...”
Krótki opis
The subject of the Order includes amongst others preparation of the Building Permit Designs in accordance with Construction Law, consisting out of: Land Development Plan, Architectural Construction Design, Technical Design, all required opinions, agreements, expertises, permits (except for the ones which will be prepared and provided by the Employer, information will be provided in the Scope of Work) for the following BAL02 and BAL03 offshore windfarm (excluding transmissions system) project packages:
• OSS: all offshore substations including topside, MSF and substructure as well as all other remaining components;
• WTG & FOU: WTGs including tower, substructure, foundation, secondary steel, other components and auxiliary equipment;
• IAC: inter-array cables network
In case of significant changes in the design, contractor will submit the so-called‚ replacement designs’ including all the incorporated amendments (OPTION)
1️⃣
Miejsce wykonania: Polska🏙️
Opis zamówienia:
“The subject of the Order includes amongst others preparation of the Building Permit Designs in accordance with Construction Law, consisting out of: Land...”
Opis zamówienia
The subject of the Order includes amongst others preparation of the Building Permit Designs in accordance with Construction Law, consisting out of: Land Development Plan, Architectural Construction Design, Technical Design, all required opinions, agreements, expertises, permits (except for the ones which will be prepared and provided by the Employer, information will be provided in the Scope of Work) for the following BAL02 and BAL03 offshore windfarm (excluding transmissions system) project packages:
• OSS: all offshore substations including topside, MSF and substructure as well as all other remaining components;
• WTG & FOU: WTGs including tower, substructure, foundation, secondary steel, other components and auxiliary equipment;
• IAC: inter-array cables network
In case of significant changes in the design, contractor will submit the so-called‚ replacement designs’ including all the incorporated amendments (OPTION)
The scope of contract is divided into two lots - Lot 1 for EWB 2 and lot 2 for EWB 3. A detailed division of tasks will be indicated at further stages of the procedure.
Pokaż więcej Kryteria przyznawania nagród
Cena nie jest jedynym kryterium udzielenia zamówienia, a wszystkie kryteria są określone tylko w dokumentach przetargowych
Czas trwania zamówienia, umowy ramowej lub dynamicznego systemu zakupów
Poniższe ramy czasowe wyrażone są w liczbie miesięcy.
Opis
Czas trwania: 30
Informacja o ograniczeniach liczby zapraszanych kandydatów
Przewidywana liczba kandydatów: 5
Obiektywne kryteria wyboru ograniczonej liczby kandydatów:
“Selection criteria:
The Ordering Party will invite to competitive dialogue Contractors who meet the conditions for participation in the Proceedings for both...”
Obiektywne kryteria wyboru ograniczonej liczby kandydatów
Selection criteria:
The Ordering Party will invite to competitive dialogue Contractors who meet the conditions for participation in the Proceedings for both Lots, in the quantity specified in the Notice, i.e. 5 (five) Contractors
The Ordering Party will invite 5 (five) Contractors who will obtain the highest number of points awarded according to the following selection criteria:
1.Number of renewable or/and conventional Energy projects executed in the last 10 years leading leading to approved Building Permit Decision by the Polish authorities, with the value of subject of the design in the amount of min. PLN 10.000.000 net. (1 point for each project).
2.Number of offshore and/or marine projects executed in the last 10 years leading leading to approved Building Permit Decision by the Polish authorities, with the value of subject of the design in the amount of min. PLN 10.000.000 net. (2 point for each project)
3.Number of projects executed for the Offshore wind industry in the Baltic Sea in the last 10 years, with the value of subject of the design in the amount of min. PLN 10.000.000 net. (3 point for each project).
If the Contractors receive the same number of points in the selection criterion, the Ordering Party, in order to determine the ranking list, will take into account the value of the projects indicated in the list of services for the criteria selection;
The basis for calculating the number of points will be the services indicated by the Contractors in the list of services for the purposes of meeting the conditions for participation in the procedure and in the list of services for the selection criteria of Contractors. If the same job is indicated in both lists, the Ordering Party will award points for one job only, the number of points will not be counted twice.
Pokaż więcej Informacje o opcjach
Opcje ✅
Opis opcji:
“1. The Ordering Party provides for the right of option (in both Lots) consisting of:
1) Calling for replacement designs to already approved building permits...”
Opis opcji
1. The Ordering Party provides for the right of option (in both Lots) consisting of:
1) Calling for replacement designs to already approved building permits with granted decisions. The replacement designs will have to be prepared based on the data provided by the employer, the extent of the potential changes to the building permit design requiring replacement designs is not known at the moment. The Contractor will estimate the amount of work and the price and the scope will be contracted after Employer’s approval.
2) Other engineering/consultancy/permitting related services not described in the scope of work (Appendix no. 1). Depending on the needs and nature of the task, the Contractor will estimate the amount of work and the price and the scope will be contracted after Employer’s approval.
2. The Ordering Party may or may not utilize the Options.
3. The Contractor shall not be entitled to demand the execution of a procurement covered by the Option.
Informacje prawne, ekonomiczne, finansowe i techniczne Warunki uczestnictwa
Wykaz i krótki opis warunków:
“1. Contractors who:
1) are not subject to exclusion in accordance with point 12.2 of the Description of needs and requirements;
2) meet the conditions for...”
Wykaz i krótki opis warunków
1. Contractors who:
1) are not subject to exclusion in accordance with point 12.2 of the Description of needs and requirements;
2) meet the conditions for participation in the procedure in accordance with item 12.7 of the Description of needs and requirements
can participate in the proccedure
The conditions forf participation for both lots of the contract are the same and should be met for both parts of the contract jointly
2. Contractors who have no grounds for exclusion from the procedure on the basis of the Code of Conduct constituting Annex 5 to the Rules of Tender Procedure by EWB-2 and EWB-3 may participate in the Procedure.
3. In order to confirm that there are no grounds for excluding the economic operator from the procedure referred to in sec. 2, the contracting authority calls on the contractors to submit, together with the application, through the SWPP2 procurement system, the following subjective means of proof, valid as of the date of their submission: A declaration of compliance with the conditions for participation specified in the Code of Conduct constituting Annex 5 to the EWB-2 and EWB-3 Tender Regulations.
4. In the event of a joint application for the award of the contract by two or more economic operators, the documents referred to in para. 2 is submitted by each contractor separately.
5. If the contractor relies on the abilities or situation of other entitiess (third parties), the documents referred to in para. 2 consists of each contractor and entity providing resources separately.
Pokaż więcej Sytuacja gospodarcza i finansowa
Wykaz i krótki opis kryteriów wyboru:
“The conditions for participation and the manner of their fulfillment have been specified in the procurement documents, in particular in points 12 and 14 of...”
Wykaz i krótki opis kryteriów wyboru
The conditions for participation and the manner of their fulfillment have been specified in the procurement documents, in particular in points 12 and 14 of the DNR If the contractor relies on the abilities or situation of other entitiess (third parties) the use of this abilities is specified in detail in point 13 of the DNR. The conditions forf participation for both lots of the contract are the same and should be met for both parts of the contract jointly
Pokaż więcej Zdolności techniczne i zawodowe
Wykaz i krótki opis kryteriów wyboru:
“The conditions for participation and the manner of their fulfillment have been specified in the procurement documents, in particular in points 12 and 14 of...”
Wykaz i krótki opis kryteriów wyboru
The conditions for participation and the manner of their fulfillment have been specified in the procurement documents, in particular in points 12 and 14 of the DNR If the contractor relies on the abilities or situation of other entitiess (third parties) the use of this abilities is specified in detail in point 13 of the DNR. The conditions forf participation for both lots of the contract are the same and should be met for both parts of the contract jointly
Pokaż więcej Warunki uczestnictwa
Wykaz i krótki opis zasad i kryteriów:
“Assessment of meeting the conditions for participation in the Proceedings and assessment of the lack of grounds for exclusion from participation in the...”
Wykaz i krótki opis zasad i kryteriów
Assessment of meeting the conditions for participation in the Proceedings and assessment of the lack of grounds for exclusion from participation in the Proceedings will be made according to the formula “meets – does not meet”, based on the information contained in the documents and statements required by the Ordering Party and set out in point 14 of the DNR. The content of the attached documents and statements must show clearly that the Contractor meets the above-mentioned conditions
Pokaż więcej
Wymagane depozyty i gwarancje:
“1.The Ordering Party at the stage of submitting bids in the procedure requires a bid bond in the amount of PLN 100.000,00 together for both Lots
2.The...”
Wymagane depozyty i gwarancje
1.The Ordering Party at the stage of submitting bids in the procedure requires a bid bond in the amount of PLN 100.000,00 together for both Lots
2.The Ordering Party requires that a Contractor whose Offer will be selected, provides a security for the proper performance of the Agreement, in the amount of 5 (five) % of the total remuneration (gross) due to the Contractor under the Agreement
Pokaż więcej
Główne warunki finansowania i ustalenia dotyczące płatności i/lub odniesienie do odpowiednich przepisów regulujących je:
“1. The financial and payment conditions for each lot will be specified in the draft terms of the contract.
2. The final version of the procurement documents...”
Główne warunki finansowania i ustalenia dotyczące płatności i/lub odniesienie do odpowiednich przepisów regulujących je
1. The financial and payment conditions for each lot will be specified in the draft terms of the contract.
2. The final version of the procurement documents for each lot will be prepared after the dialogue with the contractors
Pokaż więcej
Forma prawna, jaką musi przyjąć grupa wykonawców, którym zostanie udzielone zamówienie:
“1. Contractors jointly applying for the Procurement:
a) are jointly and severally liable for the non-performance or improper performance of the Procurement,...”
Forma prawna, jaką musi przyjąć grupa wykonawców, którym zostanie udzielone zamówienie
1. Contractors jointly applying for the Procurement:
a) are jointly and severally liable for the non-performance or improper performance of the Procurement, as well as for providing a security on due performance of the Agreement;
b) must appoint a representative to represent them in the Proceedings or to represent them in the Proceedings and to conclude the Agreement regarding this Procurement,this fact must result from the documents – all correspondence will be conducted solely and exclusively with the representative;
c) the power of attorney shall clearly indicate which of the Proceedings it applies to, the all Contractors jointly applying for the Proceedings, the details of the representative, as well as the actions that the representative may perform in the Proceedings;
d) before the conclusion of the Agreement, if a Consortium Offer is chosen as the most advantageous, the Ordering Party may request the submission of the agreement regulating the cooperation of these Contractors
Pokaż więcej Warunki związane z umową
Warunki realizacji zamówienia:
“1. The terms of the contract performance for each Lot will be specified in the draft contract provisions.
2. The dialogue conducted is confidential and may...”
Warunki realizacji zamówienia
1. The terms of the contract performance for each Lot will be specified in the draft contract provisions.
2. The dialogue conducted is confidential and may relate to all aspects of the contract.
Procedura Rodzaj procedury
Dialog konkurencyjny
Informacje administracyjne
Termin składania ofert lub wniosków o dopuszczenie do udziału w postępowaniu: 2022-01-31
14:00 📅
Języki, w których można składać oferty lub wnioski o dopuszczenie do udziału w postępowaniu: angielski 🗣️
Języki, w których można składać oferty lub wnioski o dopuszczenie do udziału w postępowaniu: polski 🗣️
Poniższe ramy czasowe wyrażone są w liczbie miesięcy.
Minimalne ramy czasowe, w których oferent musi utrzymać ofertę: 3
Informacje uzupełniające Informacje o elektronicznych przepływach pracy
Akceptowane będzie fakturowanie elektroniczne
Stosowana będzie płatność elektroniczna
Informacje dodatkowe
“1. The procedure is conducted pursuant to the Regulation of tender procedures by EWB-2 and EWB-3 and the "Utility Directive" 2014/25 / EU
2. The criteria...”
1. The procedure is conducted pursuant to the Regulation of tender procedures by EWB-2 and EWB-3 and the "Utility Directive" 2014/25 / EU
2. The criteria for evaluating tenders with their qualification from the most important to the least important are indicated in the DNR. Detailed information on the tender evaluation criteria will be indicated in the invitation to tender.
3. The application should be prepared in accordance with the template attached as Appendix 3 to the description of needs and requirements.
4. The contractor should attach to the Request at least the documents indicated in point 17 of the DNR
5. The application and documents are required to be signed with a qualified electronic signature by the person or persons authorized to represent the Contractor.
6. Submitting, supplementing or correcting statements or subjective evidence may not serve to confirm that the selection criteria are met.
7. If the authorization of the signatory does not arise directly from the document attached to the application confirming the contractor's legal status, the application should be accompanied by a power of attorney in electronic form or its digital representation of the paper version (scan) with a qualified electronic signature by the person granting the power of attorney or a notary public.
8. The Ordering Party will open applications in the SWPP2 system without the participation of contractors.
9. The description of the needs and requirements (with attachments) referred to in this announcement is available in the SWPP2 system at (https://swpp2.gkpge.pl).
10. To submit an application in the procedure, the contractor is required to register in the SWPP2 system available at (https://swpp2.gkpge.pl). SWPP2 system integrated with the One Place platform of Otwarty Rynek Elektroniczny S.A. The organizer of the procedure informs that when contractors log into the system for the first time, it is necessary to go through the registration path to the One Place suppliers zone. All interested in participating in the procurement procedure, please register without undue delay because the contractor's verification process may take up to 3 days - details on registration and submission of the application can be found in point 25 of the Description of needs and requirements.
11. Protection of personal data: pursuant to Art. 13 sec. 1-2 of Regulation (EU) 2016/679 of the European Parliament and of the Council of 27 April 2016 on the protection of individuals with regard to the processing personal data and on the free movement of such data and the repeal of Directive 95/46 / EC, the General Data Protection Regulation (hereinafter "GDPR"), we would like to inform you that:
a) the administrator of your personal data ("ADO") is: EWB 2 and EWB 3 sp. z o.o. with headquarters in Warsaw and PGE Baltica sp.z o.o., 00-542 Warsaw, ul. Mokotowska 49;
b) regarding the protection of personal data, you can contact the personal data protection inspectors appointed in the above-mentioned companies, at the registered office of the company indicated above or at e-mail addresses.
12. Specification in section IV.2.6 of the notice - the minimum period during which the contractor will be bound by the offer - 90 days from the date of submission of the offer, a specific date will be given with the invitation to submit offers (in the procurement documents) as it depends on the date of submission of tenders.
13. The proceedings are conducted via the PGE Group system at (http://swpp2.gkpge.pl).
14. The Ordering Party does not reserve the obligation to personally perform key parts of the order.
13. The contracting authority provides for one stage of dialogue with contractors, including up to five meetings with each of the contractors.
Pokaż więcej Organ kontrolny
Nazwa: International Chamber of Commerce Poland
Adres pocztowy: Leona Kruczkowskiego 8
Miasto pocztowe: Warszawa
Kod pocztowy: 00-380
Kraj: Polska 🇵🇱
Telefon: +48 224868109📞
E-mail: sekretariat@iccpolska.pl📧
Fax: +48 224587800 📠
URL: https://www.iccpolska.pl🌏 Procedura przeglądu
Dokładne informacje na temat terminu (terminów) procedur odwoławczych:
“All disputes involving applicants and tenderers arising out of or in connection with the Decisions made by the JVs during the tender procedure shall be...”
Dokładne informacje na temat terminu (terminów) procedur odwoławczych
All disputes involving applicants and tenderers arising out of or in connection with the Decisions made by the JVs during the tender procedure shall be finally settled under the Rules of Arbitration of the International Chamber of Commerce (“Rules”) without recourse to the ordinary courts of law. The Rules are included as Appendix 6 to the Regulation of tender procedures by EWB-2 and EWB-3.
Pokaż więcej Służba, od której można uzyskać informacje o procedurze odwoławczej
Nazwa: International Chamber of Commerce Poland
Adres pocztowy: Leona Kruczkowskiego 8
Miasto pocztowe: Warszawa
Kod pocztowy: 00-380
Kraj: Polska 🇵🇱
Telefon: +48 224868109📞
E-mail: sekretariat@iccpolska.pl📧
Fax: +48 224587800 📠
URL: https://www.iccpolska.pl🌏
Źródło: OJS 2021/S 251-668609 (2021-12-22)
Dodatkowe informacje (2022-01-25)
Informacje uzupełniające Numer referencyjny ogłoszenia pierwotnego
Numer ogłoszenia w Dz.U. S: 2021/S 251-668609
Zmiany Tekst, który należy poprawić w pierwotnym ogłoszeniu
Numer sekcji: IV.2.2
Miejsce tekstu, który ma być zmieniony: Time limit for receipt of tenders or requests to participate
Stara wartość
Data: 2022-01-31 📅
Czas: 14:00
Nowa wartość
Data: 2022-02-07 📅
Czas: 14:00
Źródło: OJS 2022/S 020-050534 (2022-01-25)
Obiekt Zakres zamówienia
Krótki opis:
“The subject of the Order includes amongst others preparation of the Building Permit Designs in accordance with Construction Law, consisting out of: Land...”
Krótki opis
The subject of the Order includes amongst others preparation of the Building Permit Designs in accordance with Construction Law, consisting out of: Land Development Plan, Architectural Construction Design, Technical Design, all required opinions, agreements, expertises, permits (except for the ones which will be prepared and provided by the Employer, information will be provided in the Scope of Work) for the following BAL02 and BAL03 offshore windfarm (excluding transmissions system) project packages:
• OSS: all offshore substations including topside, MSF and substructure as well as all other remaining components;
• WTG & FOU: WTGs including tower, substructure, foundation, secondary steel, other components and auxiliary equipment;
• IAC: inter-array cables network
Pokaż więcej Informacje o działkach
Niniejsze zamówienie podzielone jest na części ✅ Zakres zamówienia
Tytuł:
“Execution of the Building Permit Design together with obtaining Construction Permit for the Baltica-2 and Baltica-3 offshore windfarm projects – Lot 1 (Baltica 2)”
Tytuł
Execution of the Building Permit Design together with obtaining Construction Permit for the Baltica-2 and Baltica-3 offshore windfarm projects – Lot 1 (Baltica 2)
Pokaż więcej Tytuł
Numer identyfikacyjny działki: 1
Opis
Dodatkowe produkty/usługi: Usługi inżynieryjne w zakresie projektowania📦
Opis zamówienia:
“The subject of the Order includes amongst others preparation of the Building Permit Designs in accordance with Construction Law, consisting out of: Land...”
Opis zamówienia
The subject of the Order includes amongst others preparation of the Building Permit Designs in accordance with Construction Law, consisting out of: Land Development Plan, Architectural Construction Design, Technical Design, all required opinions, agreements, expertises, permits (except for the ones which will be prepared and provided by the Employer, information will be provided in the Scope of Work) for the following BAL02 offshore windfarm (excluding transmissions system) project packages:
• OSS: all offshore substations including topside, MSF and substructure as well as all other remaining components;
• WTG & FOU: WTGs including tower, substructure, foundation, secondary steel, other components and auxiliary equipment;
• IAC: inter-array cables network
Pokaż więcej Kryteria przyznawania nagród
Kryterium jakości (nazwa): Experience
Kryterium jakości (waga): 30
Kryterium jakości (nazwa): Methodology
Kryterium jakości (waga): 25
Kryterium jakości (nazwa): Schedule
Kryterium jakości (waga): 15
Cena (waga): 30
Informacje o opcjach
Opis opcji:
“The Ordering Party provides for the right of option, consisting of:
1. Calling for replacement designs to already approved building permits with granted...”
Opis opcji
The Ordering Party provides for the right of option, consisting of:
1. Calling for replacement designs to already approved building permits with granted decisions. The replacement designs will have to be prepared based on the data provided by the Ordering Party, the extent of the potential changes to the building permit design requiring replacement designs is not known at the moment. The Contractor will estimate the amount of work and the price and the scope will be contracted after Ordering Party’s approval.
2. Other engineering/consultancy/permitting related services not described in the scope of work (Appendix no. 1). Depending on the needs and nature of the task, the Contractor will estimate the amount of work and the price and the scope will be contracted after Ordering Party’s approval.
2️⃣ Zakres zamówienia
Tytuł:
“Execution of the Building Permit Design together with obtaining Construction Permit for the Baltica-2 and Baltica-3 offshore windfarm projects – Lot 2 (Baltica 3)”
Tytuł
Execution of the Building Permit Design together with obtaining Construction Permit for the Baltica-2 and Baltica-3 offshore windfarm projects – Lot 2 (Baltica 3)
Pokaż więcej Tytuł
Numer identyfikacyjny działki: 2
Opis
Opis zamówienia:
“The subject of the Order includes amongst others preparation of the Building Permit Designs in accordance with Construction Law, consisting out of: Land...”
Opis zamówienia
The subject of the Order includes amongst others preparation of the Building Permit Designs in accordance with Construction Law, consisting out of: Land Development Plan, Architectural Construction Design, Technical Design, all required opinions, agreements, expertises, permits (except for the ones which will be prepared and provided by the Employer, information will be provided in the Scope of Work) for the following BAL03 offshore windfarm (excluding transmissions system) project packages:
• OSS: all offshore substations including topside, MSF and substructure as well as all other remaining components;
• WTG & FOU: WTGs including tower, substructure, foundation, secondary steel, other components and auxiliary equipment;
• IAC: inter-array cables network
Procedura Informacje administracyjne
Poprzednia publikacja dotycząca tej procedury: 2021/S 251-668609
Udzielenie zamówienia
1️⃣
Numer umowy: Baltica 2
Numer identyfikacyjny działki: 1
Tytuł:
“Execution of the Building Permit Design together with obtaining Construction Permit for the Baltica-2 and Baltica-3 offshore windfarm projects - Lot 1 (Baltica 2)”
Tytuł
Execution of the Building Permit Design together with obtaining Construction Permit for the Baltica-2 and Baltica-3 offshore windfarm projects - Lot 1 (Baltica 2)
Pokaż więcej
Data zawarcia umowy: 2022-09-23 📅
Informacje o przetargach
Liczba otrzymanych ofert: 4
Liczba ofert otrzymanych od MŚP: 2
Liczba ofert otrzymanych od oferentów z innych państw członkowskich UE: 0
Liczba ofert otrzymanych od oferentów z państw spoza UE: 0
Liczba ofert otrzymanych drogą elektroniczną: 4
Zamówienie zostało udzielone grupie wykonawców ✅ Nazwa i adres wykonawcy
Nazwa: Ramboll Polska Sp. z o.o.
Krajowy numer rejestracyjny: PL5260206652
Adres pocztowy: ul. Bitwy Warszawskiej 1920 r 7
Miasto pocztowe: Warszawa
Kod pocztowy: 02-366
Kraj: Polska 🇵🇱
E-mail: rpl-biuro@ramboll.com📧
Region: Polska🏙️
Wykonawca jest małym lub średnim przedsiębiorcą
Nazwa: „PROJMORS” Biuro Projektów Budownictwa Morskiego Sp. z o.o.
Krajowy numer rejestracyjny: PL5830002982
Adres pocztowy: ul. Narwicka 2D
Miasto pocztowe: Gdańsk
Kod pocztowy: 80-557
E-mail: projmors@projmors.pl📧
2️⃣
Numer umowy: Baltica 3
Numer identyfikacyjny działki: 2
Tytuł:
“Execution of the Building Permit Design together with obtaining Construction Permit for the Baltica-2 and Baltica-3 offshore windfarm projects - Lot 2 (Baltica 3)”
Tytuł
Execution of the Building Permit Design together with obtaining Construction Permit for the Baltica-2 and Baltica-3 offshore windfarm projects - Lot 2 (Baltica 3)
“The procedure is conducted pursuant to the Regulation of tender procedures by EWB-2 and EWB-3 and the "Utility Directive" 2014/25 / EU” Procedura przeglądu
Dokładne informacje na temat terminu (terminów) procedur odwoławczych:
“All disputes involving applicants and tenderers arising out of or in connection with the Decisions made by the JVs during the tender procedure shall be...”
Dokładne informacje na temat terminu (terminów) procedur odwoławczych
All disputes involving applicants and tenderers arising out of or in connection with the Decisions made by the JVs during the tender procedure shall be finally settled under the Rules of Arbitration of the International Chamber of Commerce (“Rules”) without recourse to the ordinary courts of law
Pokaż więcej
Źródło: OJS 2022/S 196-557717 (2022-10-06)