2013-09-25   Design and construction of balance of plant for two gas-fired co-generation units including hot water heat recovery... (EDF Toruń S.A.)
Design, studies, purchasing fabrication, transport, erection, tests and commissioning of the balance of plant consisting of everything which is needed to achieve a complete new installation including in particular two hot water heat recovery boilers and district heating accumulator, but excluding two gas-fired gas turbines and several hot water boilers. Detailed description of the object of the Works will be included in the Contract template, Technical Specification, constituting part of Terms of … Wyświetlenie zamówienia »
Wymienieni dostawcy: BABCOCK BORSIG STEINMULLER GmbH